Standalone and ancillary structures
Garden offices, canopies and ancillary buildings for commercial sites, always starting with a permitted-development or prior-approval check.
Planning this for a home instead? Residential version →
Related project · OutdoorPavement seating licence1 sheets · View project →Everything your project needs
In plain English: proof of where you stand on permission, plus the drawings to submit if one turns out to be needed.
Structures we draw
- Garden offices and standalone studio buildings
- Canopies, awnings and covered walkways
- Pavement seating and tables-and-chairs licence drawings
- Storage, plant and ancillary structures
- Smoking shelters and outdoor service areas
Consents & drawings
- Permitted development and prior approval checks
- Boundary and highway assessments
- Plans, elevations and site location plans

Send your postcode and what you are planning. You get the route, the drawings you need and a fixed price in writing, usually the same working day.
Get my drawings quoted →See how pricing worksGet a free personalised plan for your project
Tell us the property and what you want to build. We confirm your planning route, the drawings you need and a fixed price in writing, at no cost. Prefer to read first? Take the free garden room guide below.
Get a personalised route check →Download the free guide (PDF)or Word version
Send your details and we will email the guide plus a route check for your own property. No spam.
Projects like yours
Quick answers
Do I need consent for pavement seating?
Yes, a pavement or tables-and-chairs licence from the highway authority, which needs a scaled layout drawing. We prepare exactly what the licensing team asks for.
What about a canopy or smoking shelter?
Depending on size, position and whether it is enclosed, it may need planning permission and can affect fire strategy. We confirm the position first.
How long does a licence take?
Typically a few weeks once submitted, though consultation periods vary by council. We prepare the drawing so it is not returned for corrections.
What does it cost?
A fixed written price after a free check, with the licence or application fee separate and flagged up front.
Tell us about your premises
Send a few details and we will confirm the right route and the drawings you need, with a fixed package price. We aim to complete your drawings within 10 working days.
Related project · SignageShopfront signage scheme2 sheets · View project →You may also need
All commercial drawing services: Extension drawings · Conversion drawings · Fit-out drawings · Measured surveys
Planning this for a home? See residential garden rooms & outdoor, or browse all architectural drawing services.
Get your drawings quoted, fast.
Tell us what you are planning. We confirm the right route and outline the council-ready drawings you need.